Who Can Set Up a Costing System for a Manufacturing Company?

Aravinth K 9 min read

Last updated: 5 October 2026

Quick Answer: A Cost Accountant with plant experience should lead the costing system for a manufacturing company, in-house or through a consulting firm. Production, stores, purchase and finance supply the data. Keep your statutory auditor out of the design: section 144 of the Companies Act, 2013 bars it from "design and implementation of any financial information system" and from management services.

Usually, the question arises when the promoter is unable to determine which products actually make money. The books show a healthy total, yet sales quotes rest on an old cost sheet and margins fall as volumes rise.

A costing system traces material, labour, machine time and overheads to each product. The design matters more than the software, so the first decision is who designs it.

Which professionals can design a manufacturing costing system?

The design should be headed by a Cost Accountant. Cost Accountants qualify through the Institute of Cost Accountants of India, the body constituted under the Cost and Works Accountants Act, 1959. What matters as much as the qualification is time spent on a shop floor similar to yours.

The Companies Act, 2013 reserves the statutory cost audit for a cost accountant holding a certificate of practice. A management costing system is a different job, so the real choice is between provider types.

Provider type What it does well What it does not do Fits when
Cost Accountant (in-house or independent) Designs cost centres, overhead rates, standard costs and variance reports Rarely redesigns the purchase, stores and production processes that feed the data The company has a finance team that can run the system once designed
Plant controller or finance head Knows the plant, owns the system after go-live Rarely has time to design it alongside the monthly close A larger plant that already has a costing cell
Management consulting or internal audit firm with Cost Accountants on its team Combines costing design with process fixes, controls and reconciliation to the books Does not configure the ERP itself Data quality is weak, or several plants and product lines need one method
ERP implementation partner Configures bills of material, routings and costing runs in the system Does not decide the costing logic; it builds what it is given The costing design is settled and signed off

Design the costing model first and configure the ERP second.

Astral Business Consulting LLP, a Coimbatore-based management consulting and audit firm, aligns the costing and financial profit and loss accounts through its virtual CFO service, and its team includes Chartered Accountants, Cost Accountants, engineers and information-systems auditors.

What does a manufacturing costing system include?

Cost systems determine the costs incurred on each product based on three elements: materials, conversion (labour and machine hours) and overheads. They then compare that cost with actual results every month.

Material cost

The calculation of the material cost depends on the Bill of Material, the way of issuing the materials (whether by method of first-in-first-out or weighted average) and also on the allowed process loss. Scrap, returns and rejections must be valued and credited, or the product carries a cost it did not consume.

Labour and machine time

Direct labour is charged on the hours booked against each job or process. In machine-heavy plants, a machine hour rate is usually a better driver than labour hours, because power, maintenance and depreciation follow running time.

Overheads and normal capacity

Overheads are allocated to cost centres and then absorbed into products. Under AS 2, Valuation of Inventories, fixed production overheads are allocated on the normal capacity of the plant, not on a low month's actual output. Overheads left unabsorbed because of idle plant are expensed in the period, not loaded onto inventory.

Choosing job, batch, process or standard costing

The technique depends on the production pattern. Most plants combine one base method with standard costing for control.

Production pattern Base method Example
One-off orders to customer drawings Job costing Castings or fabricated assemblies made to order
Repeated lots of the same item Batch costing Garment styles, pump models, spare parts
Continuous flow through stages Process costing Spinning, dairy processing, sugar
Any of the above, where control matters Standard costing with variance analysis Monthly price, usage and efficiency variances
Many products sharing heavy support costs Activity-based costing Plants where set-ups, testing or dispatch drive cost

Who in the company supplies the data?

Four departments feed the system, and the design fails if any one is left out.

  • Production supplies routings, machine hours, output, rejections and process losses by shift.
  • Stores supplies receipts, issues, returns to stores and scrap generated, against each job or cost centre.
  • Purchase supplies landed cost: price, freight, duties that are not recoverable and other charges to bring material to the factory.
  • Finance supplies the overhead pools, payroll costs and the books against which the costing profit and loss account is reconciled.

That reconciliation is the real test: the costing profit and loss account should agree with the financial one each month, with differences explained line by line.

How is a management costing system different from a statutory cost audit?

A management costing system is developed to make decisions regarding pricing, product mix and cost control. A statutory cost audit is a separate legal requirement. Under section 148 of the Companies Act, 2013, it applies only to classes of companies the Central Government specifies and is conducted by a cost accountant appointed by the Board. This article covers the management system only.

Can the statutory auditor design the costing system?

In practice, no. Section 144 of the Companies Act, 2013 bars the statutory auditor from providing the company, its holding company or its subsidiary with "design and implementation of any financial information system", and separately with management services. Nothing is stated in relation to costing systems. Because a costing system feeds the books of account and the inventory values in the balance sheet, its design is likely to fall within one or both clauses. Many boards therefore keep the statutory auditor out of the design; confirm the position with your legal adviser.

The auditor still examines the resulting inventory values, including overhead absorbed into work in progress and finished goods, when it audits the accounts.

How does the set-up run from diagnosis to the first month-end?

Most set-ups follow the same sequence.

  1. Diagnosis. Review current cost sheets, bill of material accuracy and stores records.
  2. Cost centre design. Define production and service cost centres, overhead allocation bases and absorption drivers.
  3. Standards. Set standard material usage, process loss, machine hours and rates for each product or product family, using normal capacity.
  4. Data flows. Fix the documents that carry the data: job cards, issue slips, production reports and scrap notes, with owners for each.
  5. System build. Configure the design in the ERP or, in a smaller unit, in a controlled spreadsheet model.
  6. Parallel run. Run the new system alongside the old method, reconcile both to the books and correct the standards.
  7. Reporting. Issue product-wise cost, contribution and variance reports to management each month.

AS 2 accepts standard costs for valuing inventory only if the results approximate actual cost, and expects them to be reviewed regularly and revised where needed. A standard set once and never revised drifts away from actual cost.

What goes wrong in practice?

The two examples below are illustrative, not drawn from any one company.

Foundries and casting yield

The cost of each kilogram of good castings in a foundry depends on the yield of poured metal to delivered castings. Runners, risers and rejections go back to the furnace, with a melting loss. If a company values returned material at the full metal price without any melting loss taken into account, then every casting appears cheaper than it actually is. Yield, melting loss and production cost per kilogram are among the cost drivers worth tracking in a foundry.

Spinning mills and cotton waste

In the cotton spinning industry, cotton waste is produced as a by-product. Under AS 2, immaterial by-products are often measured at net realisable value and deducted from the main product's cost. The common error is to cost every yarn count at an average mixing cost when finer counts use costlier cotton and run slower. Count-wise costing on machine hours corrects that.

Ready to put product costs on a reliable footing?

If your books cannot explain product margins, start by reconciling the costing and financial profit and loss accounts. Astral Business Consulting can review that reconciliation with your finance team. Speak to the consulting team.

Frequently Asked Questions

Do we need a costing system before implementing ERP?
Yes, at least the design. The ERP should have the information on cost centres, bill of materials, routing and overhead rates for costing purposes. Without that design, a partner asked to configure costing usually reproduces the old cost sheet, so complete and approve the design first.
How long does it take to set up a costing system?
It depends on the number of products and on the state of the stores and production records. Design work can begin within a few weeks, but the new system should run in parallel with the old method for at least two monthly closes before management relies on it or before the ERP is switched over.
Should standard costs be revised every year?
It is recommended that these be reviewed at least once every year, or earlier in case of any major shifts in material prices, wage rates or capacity. AS 2 expects standard costs to be reviewed regularly and revised in light of current conditions, so a stale standard can also misstate inventory values.
Can idle capacity be charged to product cost?
Not into inventory value. Under AS 2, fixed production overheads are absorbed on normal capacity, so idle plant cost in a slow month is written off in that period rather than carried in closing inventory. Management cost reports can still show it as a separate idle-capacity line.
Does a single-plant manufacturer need a formal costing system?
Yes, if the plant makes more than a handful of products. Without one, pricing rests on averages that hide loss-making items. A single-plant system can be simpler, often a controlled spreadsheet reconciled to the books each month, before moving into an ERP.
Who should own the costing system once it is running?
The finance head or plant controller should own it, with a named person in production and stores responsible for the data they enter into the ERP. An outside designer can train the team and review the reconciliation periodically, but day-to-day ownership must sit inside the company.
cost accounting system costing system for manufacturing company

About the Author

Aravinth K is Senior Manager, Human Resources, Administration and Accounts at Astral Business Consulting LLP, Coimbatore, and has been with the Astral group since 2014. Aravinth oversees people, administration and accounts operations across Astral Business Consulting LLP and its sister company Oodu Implementers Private Limited.